Nanjing Metro
Project introduction
The length of Metro Line 3 is 44.9 kilometers, including 42.5 kilometers in the underground section and 2.4 kilometers in the elevated section; 29 stations are set up, including 28 underground stations and 1 elevated station; the train adopts A-type drum trains 6-section marshalling, with a maximum operating speed of 80 km/h. This project uses 1129 sets of CUBIC-8000 low-voltage switchgear.
Engineering equipment
CUBIC-8000 low-voltage switchgear complete set
Other popular products
Search for more products and information
Contact information
Sales Hotline: 0519-85779127
Address:No. 88,Environmental Protection Road(No.4),Environmental Protection Park,HI-TECT District,Changzhou,Jiangsu
Fax: 0519-85779092 / 0519-85773808
P.C.: 213033
E-mail: tpydl@163.com
Official account
Mobile station
Copyright © 2020 CHANGZHOU PACIFIC ELECTRIC POWER EQUIPMENT GROUP CO.,LTD Powered by www.300.cn 苏ICP备2021053168号-1